The need for new schools, especially senior establishments, forced Hertfordshire Education Authority to search diligently for appropriate sites, often catching up with builders and developers forging ahead with their housing estates. Equally, the authority, was playing catch-up with government's regular changes of requirement and its own decisions to improve building and facility standards.
This all leads to the question of why, since 1938, the pupils of Verulam School, have walked their way to the eastern end of Sandpit Lane for their sport zone (games field). Why did the Education Authority not incorporate the buildings and the games field on one site? Good question. The short answer is the sudden requirement for all areas to create new grammar schools if no alternative buildings were available, and in St Albans, there were was only one; the Central Girls School, opened only in 1931. The plan was to create a grammar school for girls on a new site and convert the Central School for a boys' grammar school.
Negotiations between the Authority and Earl Spencer, to acquire a portion of his new development between Brampton Road and Jennings Road, which was already under construction, managed to shoe-horn sufficient space for a new school between Park Avenue and Hamilton Road. Unfortunately most houses in both of those roads were already completed and occupied. Similarly, Brampton Road homes were largely occupied, except for the space opposite Sandfield Road. The reason for such a space by the mid thirties is thought to be a new road linking Brampton Road and Churchill Road intended to connect Hatfield Road and Sandpit Lane. This aborted section of the Spencer development, intended to assist with the Authority's purchase also prepared the way for the new school's entrance location.
The space available for the proposed school was further restricted by the lengths of the rear gardens in the three roads, though not the south side of Jennings Road where housebuilding had not begun. So, under the circumstances quite limited, but under the authorised layout requirements for schools it was sufficient for a girls' grammar school, and so the plans were drawn up. In the meantime the Authority bean-counters suddenly realised the existing Central school in Hatfield Road was already a girls' school with accommodation for girls' facilities. Rather late in the day, Central became the new Grammar School and the boys were provided with the new buildings in Brampton Road.
By 1963 more buildings have been added and a tennis court relocated; garden ends have already given way to school space. COURTESY NATIONAL LIBRARY OF SCOTLAND |
It did not take long for the existing 1938 buildings to become inadequate for the new school. By 1963 the main quadrangle block to be extended on the south-west corner and to the east; and a new building and swimming pool to the north.
Since then, other accommodation and a car park has been added to reduce the grassed area to little more than an amenity space, perhaps just sufficient for a single football pitch. The school has also now acquired houses in Brampton Road, and a few rear gardens have been nibbled to squeeze in buildings.
The layout of the block today as revealed by the current Open Street Map COURTESY OPEN STREET MAP CONTRIBUTORS |
The same view, one hundred years forward from the earlier 1924 map. COURTESY GOOGLE STREET MAP |
Shoe-horning is not the answer.
2 comments:
Hi Mike. Very interesting. I attended the Boys' Grammar from 1967-74 and the survey map dated 1963 seems wrong. The gym block with swimming pool in the northern part of the plot and the 6th form block in the SE corner were not in existence in 1967 - they were built in the late 1960s during my tenure. Also, there were a couple of pre-fab classrooms along the SE boundary (war time?) that were demolished before I left in 1974. I'd guess that this map dates from around 1973 rather than 1963 but then my memory is not what is was! Martin
Thanks for your comment, Martin. What actually appears on maps can be difficult to date. The map dated 1963 on the blog post was one of the more complex ones. The sheet itself (rather than the file data for it, indicates surveying took place in June 1963 and revised further in February 1972; but levelling data is based on a survey in 1959, and boundaries were revised in 1972. You are right about the Huts, which were still on site c1960-62; I have a photo showing them. I guess we are both right overall. So much depends on the data being amended at a particular date(s) when the the revised survey took place.
Post a Comment